Skip to content

Lodestar Foundation & Structural is a fictional business. A Live Industry Staging Model of the Pier architecture by DangUIUX.

LodestarFoundation & Structural

Buying a house

Foundation movement in the option period

Your inspector flagged the foundation. What to ask for before the option period ends.

· Buying a house

Home inspectors note signs of movement; they do not measure it. If the report flags the foundation, the next step is an elevation survey and an engineer’s opinion.

What a survey tells you

How far the slab is out of level, where, and over what distance. That is the number an engineer works from.

Time matters

Option periods are short. Put the deadline on the request; a survey can usually be scheduled within days.

All notes