Process
Drawn before it is dug.
How a yard is built
Drawn, engineered, permitted, then built by one superintendent.
- 01
Walk the yard
Slope, trees, utilities, setbacks and the view from the kitchen window.
- 02
Drawn plan and section
A scaled plan, a section through the pool and spa, and a priced scope.
- 03
Engineering and permit
Structural engineering for the shell; your city permit and HOA approval.
- 04
Build, one superintendent
The same person runs your yard from layout paint to start-up.
- 05
Start-up and handover
Water balanced, equipment set, and a walk-through of every control.
Questions
When should we start to swim by summer?
For a pool and spa, start design in winter. Permits and the gunite cure set the pace; the plan above shows a sample start and swim date.
Can we build in phases?
Yes. We plan the plumbing, gas and electrical for the outdoor kitchen and cabana during the pool build, so phase two does not tear up phase one.
Do you handle the HOA?
We prepare the drawings and the submittal; you sign it. Most boards approve faster with a scaled plan.
How are payments scheduled?
The owner of this site sets their real draw schedule here; in this demo, payments are tied to finished milestones, never paid ahead of work.
Design consultation
We walk the yard with you and come back with a drawn plan.
About an hour at the house. The plan, the section and a priced scope follow.
Or call the design office: (817) 555-0192
New email ·
Design consultation request
- From
- Phone
- Their plan
- Swim
- Lot
- Town
Demo: nothing was sent. On the live site this goes straight to Vireo Pool & Garden.