Insights
Notes for owners and their teams.
- Procurement · Hard bid, CM at risk or design-build: choosing a delivery methodThe method decides when the builder joins, who carries the design and when the price is fixed.
- On site · The three-week lookahead, and why owners should read itThe master schedule says where the job should be. The lookahead says what is actually happening next.