Preconstruction
Cost and schedule, while the design can still respond.
03 / Preconstruction
The price is decided long before the first pour.
- 01
Estimate at every design stage
Conceptual at SD, assembly-based at DD, quantity takeoff at CDs, each reconciled to the last.
- 02
Constructability review
Superintendents mark up the drawings before they are issued, not after.
- 03
Options, priced
Value options listed with cost, schedule effect and what the building gives up, so the owner decides.
- 04
Buyout and GMP
At least three bids per major trade, opened with the owner on CM and negotiated work.
Delivery questions
01Which delivery method should we use?
Hard bid suits complete documents and a public process. CM at risk and design-build bring us in early, when cost and schedule can still change the design. We will say which fits your project and why.
02What is a GMP?
A guaranteed maximum price: the most the owner pays for the defined scope. Savings below it are shared or returned as the contract says.
03Can you work in an occupied building?
Most of our interiors and school work is occupied. We phase, isolate dust and noise, and work after hours where the owner needs it.
04What do you self-perform?
Concrete, rough carpentry, doors and hardware, and specialties. Everything else is bought out to qualified trade partners.
Request for qualifications or proposal
Send the RFQ. A preconstruction manager replies within one business day.
Public solicitations: send the posting link and we follow its instructions exactly.
Preconstruction: (972) 555-0179
New request ·
RFQ received · RFQ-26-0418
- From
- Organization
- Phone
- Project
- Location
- Request
- Due
- Start
- Documents
Demo: nothing was sent. On the live site this goes straight to Halvard Constructors.