02 / What we build
Six sectors. One way of running a job.
01
Industrial and warehouse
Tilt-up and pre-engineered metal; schedules set by the slab and the panels.
02
Medical office
MEP-heavy, with imaging rooms and owner equipment coordinated early.
03
Education
Summer-critical schedules, phased around occupied campuses.
04
Municipal and public
Public bid rules, prevailing documentation and council-approved milestones.
05
Retail and restaurant
Brand standards, tenant schedules and opening dates that do not move.
06
Office interiors
Occupied buildings, after-hours work and landlord rules.
Self-performed
- Concrete
- Rough carpentry
- Doors, frames, hardware
- Specialties
03 / Preconstruction
The price is decided long before the first pour.
- 01
Estimate at every design stage
Conceptual at SD, assembly-based at DD, quantity takeoff at CDs, each reconciled to the last.
- 02
Constructability review
Superintendents mark up the drawings before they are issued, not after.
- 03
Options, priced
Value options listed with cost, schedule effect and what the building gives up, so the owner decides.
- 04
Buyout and GMP
At least three bids per major trade, opened with the owner on CM and negotiated work.
04 / Prequalification
The paperwork, assembled before you ask twice.
Request what your process needs in the RFQ; it comes back as one package with a transmittal.
- A
Statement of qualifications
Company, sectors, project list, organization chart.
- B
Safety program
Site-specific plans, daily pre-task planning, weekly toolbox talks. Records on request.
- C
Insurance and surety
Certificates and surety letters issued to your requirements. The owner of this site lists real carriers and limits.
- D
Financials
Provided under a confidentiality agreement when a prequalification asks for them.
- E
W-9 and vendor forms
Your vendor setup completed with the package.
05 / Project index
Built, by sector, size and months.
| No. | Project | Sector | Sq ft | Delivery | Months |
|---|---|---|---|---|---|
| H-24-07 | Distribution building, cross-dockDenton · Tilt-up, 36 ft clear, 52 dock doors | Industrial | 248,000 | Negotiated | 9 |
| H-24-03 | Medical office building, three storiesFrisco · Imaging suite, ambulatory surgery shell | Medical | 46,000 | CM at risk | 14 |
| H-23-19 | Elementary school additionIrving · Twelve classrooms, phased on an occupied campus | Education | 31,000 | CM at risk | 11 |
| H-23-11 | Fire stationFort Worth · Three apparatus bays, living quarters | Municipal | 14,500 | Hard bid | 13 |
06 / On site
Every Friday, the next three weeks, trade by trade.
- DailyReport with manpower, weather and photos
- WeeklyOwner-architect-contractor meeting and minutes
- FridayThree-week lookahead with decisions needed
- MonthlyPay application, cost report and updated schedule
07 / Client notes
From owners, architects and districts.
Sample reviews written for this fictional company
Every estimate tied back to the last one. When the GMP came in, nobody in the room was surprised, which is the point of preconstruction.
L. Navarro · Owner’s representative, healthcare · Medical office, CM at risk
Their superintendent marked up our DD set and caught a sequencing problem with the occupied wing before it was drawn into the CDs.
T. Okonkwo · Project architect · School addition
The three-week lookahead came every Friday, and the classrooms were ready the week before teachers came back.
P. Hargrove · Director of facilities, school district · Summer phasing
08 / Where we build
North Texas, from an office in Irving.
- IrvingOur office. Corporate interiors in Las Colinas and school work across the district.
- DallasRetail pads, restaurants and medical office along the freeways.
- Fort WorthMunicipal work and industrial along the north corridor.
- FriscoMedical office and education in a growing north suburb.
- DentonDistribution buildings along I-35E and I-35W.
Request for qualifications or proposal
Send the RFQ. A preconstruction manager replies within one business day.
Public solicitations: send the posting link and we follow its instructions exactly.
Preconstruction: (972) 555-0179
New request ·
RFQ received · RFQ-26-0418
- From
- Organization
- Phone
- Project
- Location
- Request
- Due
- Start
- Documents
Demo: nothing was sent. On the live site this goes straight to Halvard Constructors.