Skip to content

Corbel Roof Systems is a fictional business. A Live Industry Staging Model of the Parapet architecture by DangUIUX.

CorbelRoof systems

Restoration

A coating is for a dry roof. We check first.

R-3

Ponding

A coating does not fix ponding. Slope does.

Before any restoration, drains are reset and crickets added where water stands two days after rain.

BEFORE STANDING WATER AFTER CRICKET SLOPES WATER TO THE BOWL SAMPLE DETAIL · NOT TO SCALE

The restoration sequence

  1. 01

    Survey

    Infrared and cores. Wet areas are cut out and replaced first.

  2. 02

    Clean

    Power wash and let it dry fully.

  3. 03

    Repair

    Seams, flashings and curbs reinforced.

  4. 04

    Correct ponding

    Crickets and drain work where water stands.

  5. 05

    Coat

    Silicone in two coats, measured for thickness as we go.

Bid request

Send the building. We send back a scope you can sign.

A complete request gets a site visit scheduled the same week.

  • Roof area and the building address
  • What you see, or the survey summary
  • The date your bid or budget is due
  • Which paperwork you need from us

Or call the office: (972) 555-0148

DemoThis form works but sends nothing. Try it.

01 The building
You are
02 The package
What you can send us
Vendor paperwork you need from us
03 You